Back
in September 2013 we talked to the guys on the Fischer Panda stand at the Southampton
Boat Show because we knew that our generator was very sick and would most
likely need to be replaced. After we had visited BV in October we knew that a
new generator was needed because the salt-water damage was so bad and so we confirmed
the order and set in motion arrangments for shipping the generator out to BV when we would be
back on board in 2014.
Well
now, 5 months on, a 115 kg box has been delivered to the quayside in front of
BV’s mooring. Fantastic, all of the shipping and delivery arrangements have worked…
but how, with just 2 of you, do you lift a 115 kg box on board and get it down
below so that the generator can be fitted?
The
pictures show our solution to the problem…
Now all we need to do is unpack it and start fitting it.
No comments:
Post a Comment
Note: only a member of this blog may post a comment.